- Port Entry Requirements:
- Mandatory pre-arrival documentation (72h prior ETA):
- Maritime Declaration of Health (valid 24h)
- Crew list with passport/CDC numbers
- IMO FAL Forms 1-6 (completed)
- Ship Particulars Form (Port Authority template)
- Updated quarantine measures:
- African ports: Fumigation certificate + 12h quarantine
- South America: Yellow fever vaccination records
- Southeast Asia: Additional crew temperature logs
- New requirement: Cyber security declaration form
- Mandatory pre-arrival documentation (72h prior ETA):
- Navigation Updates (July 2024):
- Channel dredging works (15 July – 30 Oct 2024):
- Section C-D: Reduced width 250m (daylight only)
- Section E-F: Depth temporarily 14.5m (from 16m)
- Survey vessel “Hai Ce 302” operating in area
- Revised buoy positions:
- No.3 Fairway buoy: 21°26’15″N 111°17’42″E
- No.5 Turning buoy: Displaced 200m SW
- New restriction: VLCCs must transit at slack water (±1h)
- Channel dredging works (15 July – 30 Oct 2024):
- Cargo Operations:
- Hazardous materials handling:
- Class 1: Berth CT-2 only (72h pre-advice)
- Radioactive: 48h notice + special escort
- New: Lithium batteries require separate storage
- Container operations:
- VGM submission 12h pre-loading (100% verification)
- Reefer monitoring: Hourly logs required
- New: IMDG container segregation checks
- Bulk cargo restrictions:
- Coal: Maximum moisture content 12%
- Grain: Fumigation certificate mandatory
- Hazardous materials handling:
- Bunkering Regulations:
- Operational procedures:
- Pre-transfer meeting with Port State inspector
- Continuous gas monitoring (LEL < 10%)
- New: Flowmeter calibration certificates required
- Approved suppliers (2024):
- Sinopec Maoming Branch (IFO, MGO)
- CNOOC Marine Fuel (LNG, biofuels)
- New: Maoming Green Bunker Co. (LNG only)
- Emergency shutdown procedures revised
- Operational procedures:
- Environmental Compliance:
- Discharge controls:
- Zero discharge within 12nm (including gray water)
- Oil record book: 100% inspection rate
- New: Plastic logbook mandatory
- Air emissions:
- 0.1% sulfur at berth (continuous monitoring)
- Shore power: Container ships >5,000 TEU must connect
- New: NOx monitoring for vessels built after 2021
- Discharge controls:
- Security Measures:
- ISPS updates:
- Security Level 2: Permanent armed guards
- Gangway watch: 24/7 with CCTV recording
- New: Drone exclusion zone 500m around vessels
- Cyber security:
- ECDIS patches: Verified pre-entry
- USB ban: All external media prohibited
- New: Mandatory firewall audit report
- ISPS updates:
- Pilotage Services:
- Boarding positions:
- North approach: 21°25’30″N 111°19’00″E
- South approach: 21°22’45″N 111°16’30″E
- New: Emergency boarding area at 21°24’00″N 111°18’00″E
- Helicopter transfers:
- Winching area: 10m clearance required
- Night ops: Prohibited without exception
- New: Medical evacuation priority protocol
- Boarding positions:
- Emergency Procedures:
- Contact updates:
- Port Control: +86 668 12395 (24/7 English)
- Oil Spill: +86 668 12396 (response within 30min)
- New: Medical emergency hotline +86 668 12397
- Evacuation protocols:
- Helipad: 21°27’00″N 111°18’30″E (marked)
- Ambulance: 5-minute response time
- New: Mass casualty incident plan
- Contact updates:
- Crew Change Protocols:
- Documentation:
- Vaccination records (WHO approved only)
- Immigration clearance pre-arrival
- New: Biometric data submission 72h prior
- Facilities:
- Crew terminal: Berth GC-3 (24h operation)
- Shore leave: Restricted to terminal area
- New: Quarantine holding rooms added
- Documentation:
- Port Dues and Fees:
- 2024 tariff:
- Anchorage: $0.08/GT/day (min $500)
- Waste: $120/ton (hazardous), $80/ton (general)
- New: Carbon levy $5/ton fuel consumed
- Payment:
- Wire transfer: Bank of China only
- Advance payment: >100,000 DWT vessels
- New: Digital RMB accepted
- 2024 tariff:
- Weather Restrictions:
- Monsoon operations:
- NE monsoon (Oct-Mar): Max wind 20m/s
- SW monsoon (Apr-Sep): No bunkering if lightning
- New: Real-time weather monitoring link
- Typhoon procedures:
- Signal 3: All operations stop
- Evacuation: >50,000 DWT must depart
- New: Designated typhoon moorings
- Monsoon operations:
- Port State Control:
- 2024 focus areas:
- Fuel samples: 100% for tankers, 30% others
- Lifeboats: Launch test witnessed
- New: CII documentation verification
- Common deficiencies:
- Garbage records: Incorrect categorization
- Emergency exits: Blocked or locked
- New: Missing EEXI technical files
- 2024 focus areas:
- New: Dangerous Goods Storage:
- Class 3-6: Designated warehouse DGW-2
- Temperature control: 24/7 monitoring
- Security: Armed guards + CCTV
- New: ECDIS Requirements:
- ENC updates: Weekly verification
- Backup systems: Independent power source
- Training: Certificates for all deck officers
Critical Notes:
- Changes effective immediately unless specified
- Non-compliance may result in detention/fines
- Electronic updates: www.maomingport.gov.cn/en/alerts
- Verification contact: ops@maomingport.gov.cn




