| Terminal Name |
Berth Name |
Length (m) |
Depth (m) |
DWT Capacity |
Max LoA (m) |
Berth Type |
Shore Cranes |
Safe Working Load (SWL) |
Main Cargo |
Note |
| Nantong Container Terminal |
NCT-1 |
280 |
12.5 |
50,000 |
275 |
Quay Wall |
3 STS (50t) |
50t under spreader |
Containers |
Commissioned 2010 |
| NCT-2 |
280 |
12.5 |
50,000 |
275 |
Quay Wall |
3 STS (50t) |
50t under spreader |
Containers |
Reefer plugs: 200 |
| NCT-3 |
300 |
13.0 |
60,000 |
295 |
Quay Wall |
2 STS (65t) |
65t twin-lift |
Containers |
Shore power available |
| NCT-4 |
300 |
13.0 |
60,000 |
295 |
Quay Wall |
2 STS (65t) |
65t twin-lift |
Containers |
Dangerous goods zone |
| NCT-5 |
250 |
11.5 |
40,000 |
245 |
Quay Wall |
2 STS (40t) |
40t under spreader |
Containers |
Feeder services |
| NCT-6 |
250 |
11.5 |
40,000 |
245 |
Quay Wall |
2 STS (40t) |
40t under spreader |
Containers |
Barge operations |
| Yangkou Oil Terminal |
YOT-1 |
320 |
15.5 |
250,000 |
315 |
Dolphin |
None |
N/A |
Crude Oil |
2×16″ loading arms |
| YOT-2 |
320 |
15.5 |
250,000 |
315 |
Dolphin |
None |
N/A |
Fuel Oil |
Heated pipelines |
| YOT-3 |
280 |
14.0 |
100,000 |
275 |
Dolphin |
None |
N/A |
Chemicals |
Stainless steel piping |
| Tongzhou Bay Bulk Terminal |
TBT-1 |
300 |
14.0 |
100,000 |
295 |
Quay Wall |
2 Unloaders |
45t grab |
Coal |
4,000t/hr capacity |
| TBT-2 |
300 |
14.0 |
100,000 |
295 |
Quay Wall |
2 Unloaders |
45t grab |
Iron Ore |
Magnetic separators |
| TBT-3 |
250 |
12.5 |
70,000 |
245 |
Quay Wall |
1 Unloader |
30t grab |
Grain |
Dust control system |
| TBT-4 |
200 |
11.0 |
50,000 |
195 |
Quay Wall |
None |
N/A |
General Bulk |
Ship’s gear used |
| Gangzha General Cargo Terminal |
GGT-1 |
200 |
10.5 |
30,000 |
195 |
Wharf |
2 Gantry (32t) |
32t |
Steel Products |
Coil handling |
| GGT-2 |
200 |
10.5 |
30,000 |
195 |
Wharf |
2 Gantry (32t) |
32t |
Timber |
Fumigation area |
| GGT-3 |
150 |
9.5 |
20,000 |
145 |
Wharf |
1 Mobile (100t) |
100t |
Project Cargo |
Heavy lift zone |
| Yangkou LNG Terminal |
YLT-1 |
380 |
15.0 |
266,000 |
375 |
Jetty |
None |
N/A |
LNG |
Commissioned 2022 |
| Nantong Cruise Terminal |
NCT-1 |
320 |
9.5 |
N/A |
315 |
Pier |
None |
N/A |
Passengers |
3 gangways |
| Mooring Buoys |
| Outer Anchorage A |
MB-1 |
N/A |
18.0 |
300,000 |
N/A |
Single Point |
None |
N/A |
Crude Oil |
VLCC lightering |
| Outer Anchorage B |
MB-2 |
N/A |
16.0 |
150,000 |
N/A |
Single Point |
None |
N/A |
Bulk |
Waiting area |
| Lighterage Facilities |
| Yangtze Lighterage Zone A |
LZ-1 |
N/A |
12.0 |
50,000 |
N/A |
Open Water |
None |
N/A |
All Cargo |
3nm NE of main port, max 5 vessels simultaneously |
| Yangtze Lighterage Zone B |
LZ-2 |
N/A |
10.5 |
30,000 |
N/A |
Open Water |
None |
N/A |
Containers |
Barge operations, max 3 barges per vessel |
| Yangtze Lighterage Zone C |
LZ-3 |
N/A |
9.5 |
20,000 |
N/A |
Open Water |
None |
N/A |
General Cargo |
Daylight operations only, max 2 vessels |
| Port Dolphins |
| Riverside Dolphin Group |
PD-1 |
40 |
12.0 |
20,000 |
N/A |
Dolphin |
None |
N/A |
Tugs |
Pilot transfer point, fender type: Cone 1000H |
| Riverside Dolphin Group |
PD-2 |
40 |
12.0 |
20,000 |
N/A |
Dolphin |
None |
N/A |
Tugs |
Emergency mooring, lighting: 360° white |
| Yangkou Approach Dolphins |
PD-3 |
50 |
15.0 |
50,000 |
N/A |
Dolphin |
None |
N/A |
VLCC |
Approach navigation, radar reflector installed |
| Yangkou Approach Dolphins |
PD-4 |
50 |
15.0 |
50,000 |
N/A |
Dolphin |
None |
N/A |
VLCC |
Secondary navigation point |
| Piers |
| Port Service Pier |
PSP-1 |
120 |
6.0 |
N/A |
100 |
Pier |
None |
N/A |
Service Vessels |
Pilot boats, tugs, port authority |
| Coast Guard Pier |
CGP-1 |
80 |
5.0 |
N/A |
75 |
Pier |
None |
N/A |
Official Use |
Restricted access |
| Ship Repair Pier |
SRP-1 |
150 |
7.5 |
10,000 |
145 |
Pier |
1 Mobile Crane (25t) |
25t |
Repair Services |
Drydock access available |
| Wharves |
| Gangzha General Cargo Wharf |
GGW-1 |
200 |
10.5 |
30,000 |
195 |
Wharf |
2 Gantry (32t) |
32t |
General Cargo |
Timber, steel products |
| Gangzha General Cargo Wharf |
GGW-2 |
200 |
10.5 |
30,000 |
195 |
Wharf |
2 Gantry (32t) |
32t |
General Cargo |
Project cargo handling |
| Riverside Small Vessel Wharf |
RSV-1 |
150 |
6.0 |
5,000 |
145 |
Wharf |
None |
N/A |
Coastal Vessels |
Max draft 6.5m |