Port Rules and Regulations,Compliance and Enforcement of Aioi Port

0
212
Port Rules and Regulations,Compliance and Enforcement of Aioi Port

1. Port Rules and Regulations
1.1. General Provisions
Aioi Port operates under the Port Regulations Act  of Japan and local ordinances of Hyogo Prefecture. All vessels must comply with:
– International Maritime Organization (IMO) conventions ratified by Japan (SOLAS, MARPOL, COLREGs)
– Japanese Ports and Harbors Act
– Special Port Regulations of Hyogo Prefecture
– ISPS Code requirements for port facility security

1.2. Navigation Rules
– Speed limit: 8 knots within port limits (Hyogo Prefectural Ordinance No. 42)
– Mandatory VHF monitoring: Channel 16 (safety) + Channel 12 (port operations) (Aioi Port Notice 2020-5)
– Prohibited areas: 500m radius around LNG terminal (Aioi Port Security Zone Regulation)
– Movement plan submission: 2 hours before entry for vessels >200 GT (Japan Coast Guard Directive KOBE-2021-003)
– Tugboat requirements: Escort mandatory for vessels >50,000 DWT (Aioi Port Tugboat Guidelines)
– Daylight navigation only for vessels with air draft >40m (Harima Nada Bridge restriction)

1.3. Berthing Regulations
– Advance notice: 24 hours for vessels >500 GT (Aioi Port Management Office Notice 2021-3)
– Mooring requirements:
– Minimum 6 lines for vessels >10,000 DWT
– Additional lines required during typhoon season (June-October)
– Synthetic fiber ropes prohibited for vessels >30,000 DWT (Port of Aioi Mooring Standards)
– Operational restrictions:
– Daylight only for hazardous cargo (Port Fire Service Directive)
– Mandatory fender inspection before berthing (Aioi Port Facility Safety Code)
– Maximum stay duration: 72 hours without special permission

1.4. Environmental Regulations
– Ballast water: Zero discharge without treatment (MARPOL Annex D + Japan MLIT Regulation)
– Air emissions:
– Low-sulfur fuel (<0.1%) mandatory at berth (Japan Air Pollution Control Act)
– Shore power connection required for vessels >10,000 GT (2025 regulation)
– Waste management:
– Prohibition of open burning (Hyogo Prefecture Environmental Ordinance Article 15)
– Mandatory garbage segregation (MARPOL Annex V)
– Special handling for plastic waste (Japan Plastic Resource Circulation Act)

2. Compliance Requirements
2.1. Document Submission
Required documents (timelines):
– ISPS Code compliance (72 hours prior)
– Waste management plan (MARPOL Annex V)
– Crew documents:
– List with valid medical certificates (Japan Quarantine Act)
– STCW certificates for officers
– Cargo documents:
– Manifest with hazardous materials declaration (IMDG Code)
– Dangerous goods stowage plan
– Operational documents:
– Ballast Water Management Record Book (MLIT Regulation)
– Last port clearance certificate

2.2. Safety Equipment
Mandatory equipment includes:
– Gas detection systems for tankers (SOLAS Chapter XI-1/7)
– Life-saving appliances:
– SOLAS-approved lifeboats/rafts
– Immersion suits (November-March)
– Emergency position indicators
– Firefighting systems:
– Port-approved inspection records
– Minimum 2 fire pumps operational
– Additional requirements:
– Emergency towing arrangements (>20,000 GT)
– Oil spill containment gear for tankers
– Bridge navigational watch alarm system (BNWAS)

2.3. Crew Certification and Health
– Certification requirements:
– Valid STCW certificates
– Port-specific familiarization training
– Health regulations:
– Alcohol limit: 0.03% BAC for duty personnel (Japan Maritime Safety Law Article 23)
– Mandatory drug testing for certain operations
– COVID-19 reporting for febrile cases (Japan Quarantine Act Amendment 2020)
– Working conditions:
– Maximum 14-hour work periods
– Minimum 10 hours rest per 24-hour period

3. Enforcement Measures
3.1. Inspection Regime
Conducted by:
– Japan Coast Guard (PSC inspections using Tokyo MOU criteria)
– ClassNK (annual structural checks for regular vessels)
– Port Authority (unannounced ISPS security drills quarterly)
Inspection focus areas:
– Safety equipment functionality
– Documentation completeness
– Crew working conditions
– Environmental compliance

3.2. Penalty System
Non-compliance consequences:
– Operational violations:
– Fine up to ¥500,000 (Port Regulations Act Article 56)
– Immediate expulsion for ISPS breaches
– Environmental violations:
– Suspension of port entry for MARPOL violations (up to 1 year)
– Criminal charges for deliberate pollution (Japan Penal Code Article 142)
– Safety violations:
– Operational suspension for critical safety failures
– Blacklisting for repeat offenders

4. Emergency Procedures
4.1. Pollution Response
– Reporting:
– Immediate notification to Aioi Marine Pollution Control Center
– Follow-up written report within 6 hours
– Containment requirements:
– Oil booms deployment within 30 minutes for tankers
– 500m safety zone for chemical spills
– Cleanup standards:
– Approved disposal contractors only
– Post-incident water quality testing

4.2. Medical Emergencies
– Facilities:
– First aid stations at Pier 3 and West Terminal
– Designated quarantine area
– Evacuation procedures:
– Helicopter coordination via JCG Kobe Station (VHF Ch16)
– Ambulance access routes maintained clear
– Infectious disease protocols:
– Isolation procedures
– Contact tracing requirements

4.3. Weather and Seismic Events
– Typhoon response:
– Warning level 3: Cargo operations cease
– Warning level 4: Mandatory evacuation
– Earthquake procedures:
– Intensity 5+: Tsunami evacuation
– Post-quake structural inspections required
– Tsunami preparedness:
– Designated evacuation routes
– Height markers at all berths

5. Operational Restrictions
5.1. Cargo Operations
– Prohibited materials:
– UN Class 1 explosives without permit
– Radioactive materials exceeding Category II
– Operational limits:
– Night operations require Port Master approval
– Grain dust control measures mandatory
– Maximum simultaneous operations: 2 cranes per vessel

5.2. Vessel Activities
– Crew shore leave:
– Designated zones only
– Curfew: 2200-0600 hours
– Work permits:
– Hot work requires safety briefing
– Confined space entry permits
– Prohibited activities:
– Fishing from vessels
– Unauthorized photography of port facilities

6. Technical Standards
6.1. Vessel Specifications
– Dimensional limits:
– Maximum LOA: 250m (West Terminal)
– Air draft: 45m (bridge restriction)
– Draft: 14m (channel depth)
– Equipment requirements:
– AIS transponder (>300 GT)
– VHF DSC capability
– ECDIS (vessels >10,000 GT)

6.2. Port Infrastructure
– Terminal capabilities:
– West Terminal: 100,000 DWT max
– East Terminal: 50,000 DWT max
– Equipment standards:
– Container cranes: 50-ton SWL
– Mooring bollards: 150-ton capacity
– Navigation aids:
– IALA Buoyage System
– Radar coverage of entire port area