Port Dolphins, Mooring Bouys, Piers , Berths , Lighterages and Wharves of Taizhou Port Zhejiang

0
179
Port Dolphins, Mooring Bouys, Piers , Berths , Lighterages and Wharves of Taizhou Port Zhejiang

 

Toumen Bulk Terminal TM-1 280 15.5 150,000 270 Quay 2 unloaders (2,500 tph) N/A Iron ore – Dust suppression (fog cannons)
– Load sensors (Class III)
– Metal detectors
– Max moisture 8%
– No lumps >50mm
– No simultaneous ops
2023-12
TM-2 250 14.0 100,000 240 Quay 1 unloader (1,800 tph) N/A Coal – Spark detection (IR+UV)
– Water spray system
– Temperature probes
– Sulfur <1%
– No spontaneous combustion
– Max temp 65°C
2024-01
TM-3 200 12.0 50,000 190 Wharf None N/A Agricultural – Rodent control (IPM)
– Moisture barriers
– Aeration system
– ISPM-15 compliant
– No foreign matter
– Max moisture 14%
2023-11
TM-S 150 9.0 15,000 140 Wharf None N/A Sand/gravel – Runoff control
– Wheel wash
– Load scanners
– Max wind 12m/s
– Spillage <0.5%
– No night ops
2023-10
TM-E 100 7.0 5,000 90 Emergency None N/A N/A – Oil spill equipment
– Emergency lighting
– First aid station
– Standby use only
– Max stay 12h
2024-02
Jiaojiang Chemical Terminal JCH-1 200 12.5 30,000 180 Dolphin Acid-resistant arms N/A Class I chemicals – Neutralization station
– Emergency showers (30s flush)
– Secondary containment
– Full PPE required
– No aluminum parts
– Max transfer 800m³/h
2023-12
JCH-2 180 11.5 20,000 170 Dolphin Stainless steel arms (316L grade) N/A Class II chemicals – Spill containment (200% capacity)
– pH monitoring (continuous, 0-14 range)
– Vapor recovery (95% efficiency)
– Secondary sealing system
– Emergency deluge (50m³/min)
– Ex-rated equipment (ATEX Zone 1)
– Max transfer rate: 600m³/h
– No aluminum/copper alloys
– Bonding resistance <10Ω
– Static accumulation monitoring
– Mandatory pre-transfer checklist
– No operations during thunderstorms
2024-01
JCH-3 220 13.0 50,000 200 Quay PTFE-lined arms N/A Class III chemicals – VOC detectors (0-100% LEL)
– Inert gas system (99.9% N2)
– Double mechanical seals
– Bonding required (<10Ω)
– No smoking zone (50m)
– Max temp 40°C
2024-01
JCH-4 150 10.0 10,000 140 Wharf None N/A Packaged goods – Drum handlers (1t capacity)
– Spill kits (Type A/B/C)
– Explosion-proof lighting
– Max stack 3 high
– No damaged packaging
– Forklift speed <10km/h
2023-11
JCH-5 120 8.0 5,000 110 Barge None N/A Lab chemicals – Climate control (15-25°C)
– Security seals (tamper-proof)
– CCTV monitoring
– Escort required
– No night ops
– Max 5 drums/hour
2023-10
JCH-E 100 7.0 3,000 90 Emergency None N/A N/A – Fire monitors (6,000 l/min)
– Boom deployment system
– Decon showers
– Monthly drills required
– 24/7 standby
– No commercial use
2024-02
JCH-W 80 6.0 1,000 70 Waste None N/A Chemical waste – Secondary containment
– Explosion-proof equipment
– Neutralization capacity
– Pre-approval required
– Manifest required
– Max 20m³/day
2023-09
Taizhou Outer Anchorage MB-1 N/A 25.0 300,000 360 Single buoy N/A N/A Crude oil – Radar reflector (X-band)
– Light beacon (10nm range)
– AIS transmitter
– Max current 3 knots
– No ops in swell >3m
– Tugs standby required
2024-01
Yuhuan STS Area MB-2 N/A 30.0 200,000 330 Multi-buoy N/A N/A LNG transfer – IR cameras (thermal imaging)
– Gas detection (0-100% LEL)
– Emergency release system
– Min distance 500m
– Max wind 12m/s
– No ops during lightning
2023-12
Haimen Holding Area MB-3 N/A 20.0 100,000 250 Single buoy N/A N/A General – Mooring hawser (SWL 200t)
– GPS monitoring (±1m)
– Emergency release
– Max stay 72h
– No cargo ops
– Position reports hourly
2023-11
Jiaojiang Temporary MB-4 N/A 18.0 50,000 200 Single buoy N/A N/A General – Light beacon (6nm)
– Radar reflector
– Mooring eye (SWL 100t)
– Daylight use only
– Max wind 15m/s
– No hazardous cargo
2024-02
Taizhou Lighterage Zone LZ-1 500 8.0 5,000 150 Barge dock 2 mobile (25t) 25 General cargo – Fender system (D600)
– Load indicators (±2%)
– Anti-collision system
– Tidal window ±3h
– Max 12 barges
– No ops in current >2.5kt
2023-12
LZ-2 300 6.0 2,000 100 Barge dock 1 mobile (15t) 15 General cargo – Mooring bollards (SWL 50t)
– Fire hydrants (30m spacing)
– Lighting (50 lux)
– Daylight ops only
– Max beam 18m
– No hazardous materials
2024-01
LZ-3 200 5.0 1,000 80 Barge dock None N/A Service – Oil boom connections
– Emergency power
– First aid station
– Maintenance use only
– Max stay 6h
– No cargo ops
2023-11
Taizhou Fishing Port FP-1 800 6.0 500 50 Wharf None N/A Fishing vessels – Ice supply points
– Net repair stations
– Fish auction area
– Commercial fishing only
– No cargo ops
– Priority for local fleet
2023-10
Sanmen Public Pier SP-1 150 5.0 1,000 70 Pier None N/A Passenger/General – Passenger shelter
– Security screening
– Emergency exits
– Max 200 passengers
– No hazardous cargo
– Daylight ops only
2024-02

Validation Notes:
1. All depth measurements verified against:
– China Maritime Safety Administration charts (2024)
– Port Authority bathymetric surveys (2023-2024)
2. Load capacity calculations per:
– IACS UR S26 (2023)
– China GB/T 16560-2018
3. Safety systems comply with:
– SOLAS Chapter II-2
– IMO MSC.1/Circ.1216
4. Operational restrictions based on:
– Port State Control records
– Terminal operating manuals
5. Last validation date: June 2024 by:
– China Classification Society
– Taizhou Port Authority Engineering Dept.

Critical Safety Reminders:
1. Mooring arrangements must be approved by Port Captain prior to operations
2. All hazardous cargo operations require:
– Pre-operation meeting
– Standby emergency equipment
– Continuous gas monitoring
3. Typhoon preparedness:
– Evacuation procedures activated at Signal #3
– Mandatory double mooring lines at 15m/s winds
4. Navigation warnings:
– Strong currents (up to 4kt) in Jiaojiang River mouth
– Fog restrictions apply when visibility <500m