GTT has secured an order from the shipyard Samsung Heavy Industries for the tank design of three new liquefied natural gas (LNG) carriers, on behalf of an American ship-owner.
GTT will design the cryogenic tanks of the vessels, each offering a total capacity of 174,000 m3. T
he tanks will be fitted with the Mark III Flex membrane containment system, a technology developed by GTT.
Delivery of the vessels is scheduled for the first and second quarters of 2029.




